1400 m2 HAKITEC roof in Surrey, England

Read more »

The Clock Building in Ås, Norway

An unusual challenge which will soon be completed.

Read more »

Unique weather protection system in Visby, Sweden

HAKI’s designers have produced new, effective, safe solutions to bridge an unusually wide span.

Read more »

Special bridge constructed for Crick Boat Show in the UK

A bridge is constructed every year for the show, enabling thousands of visitors to cross the Grand Union Canal safely from Crick village. This year, for the first time, show contractors Cape Plc will be assembling the bridge using the revolutionary Swedish HAKI scaffolding system.

Read more »

Bristol City FC Ashton Gate Stadium

The slip resistant treads and 1.6m wide stairs provided safe access to the stands for the fans attending matches at the stadium including the sell-out FA Cup match against West Ham.

Read more »

HAKI Public Access Stair takes tourists up to the Tower of London

The Tower of London receives over 3 million visitors each year and is the eighth most popular attraction in London. Whilst renovation works take place, it is important the Scheduled Ancient Monument remains open to the public. The HAKI Public Access Stair delivered a safe and strong alternative access way to the White Tower for up to 100 visitors at a time, allowing works to replace the entrance steps to take place.

Read more »

Interserve Albion Gate Housing Development

Taylor Wimpey and Interserve choose HAKI Universal for the new housing development in Preston, UK

Read more »

J.F.E Attridge Scaffolding Debut the New HAKI Bridge System Across Rail Track in Swindon, UK

International system scaffold manufacturer HAKI, has developed the new HAKI Bridge System. Alongside the HAKI Public Access Stair, it is providing temporary access across tracks at Swindon during significant upgrades. J.F.E Attridge scaffolding had a limited time to supply access over the live track and were able to position and secure the bridge in just 15 minutes of track possession time.

Read more »

Castle Drogo in the UK

Due to the vast schedule of works taking place SRK Scaffolding had 14 weeks over two phases to erect a temporary roofing system, the support scaffold and access scaffold to fully cover and surround the Castle. SRK chose to use HAKITEC 750 temporary roofs and HAKI Universal system.

Read more »

Brecon Scaffolding

Two structures 82m long, 6m high to working platform. The Tube & Fittings structure took 6 days, the HAKI Universal structure took only 2 days.

Read more »

EDF Heysham 2

Provide access for the Unit 8 outage in the turbine hall

Read more »

National Grid Ironbridge Substation

Cape completed the job 3 days quicker compared to Tube and Fittings

Read more »

Polimeri Europa South Sphere

The project was completed ahead of schedule and compliant with SG4:10 using collective measures

Read more »

The HAKI Stair Tower on The Tower

The HAKI Stair Tower being built to 51 stories

Read more »

Drop Scaffold at Cunard Building, Liverpool Pierhead

Contractor: ISG / Scaffolding Contractor: HT Scaffolding Ltd

Read more »

Remedial Works to Mersey Viaduct, Warrington

Contractor: Network Rail / Scaffolding Contractor: J.F.E. Attridge Scaffolding Services Ltd

Read more »

New Build at De Montfort University

Contractor: Rok / Scaffolding Contractor: High Peak Scaffolding Ltd

Read more »

Wadworth Viaduct A1(M)/M18 Repairs

Contractor: May Gurney / Scaffolding Contractor: Pyeroy Ltd

Read more »

A48 Bridge Works in Cardiff

Scaffolding Contractor: J.F.E. Attridge Scaffolding Services Ltd, Staffs.

Read more »

HAKI Light on Royal Albert Bridge

Contractor: Taziker Industrial / Client: Network Rail / May 2011 to July 2013

Read more »

Birdcage to Coors Malting Tower

Contractor: Interserve Industrial Services / Client: Coors Brewery, Burton-upon-Trent

Read more »

HAKI has Covent Garden covered

When a historic building in Covent Garden, London underwent major reconstruction a HAKITEC 750 temporary roof structure provided total weather protection throughout the works.

Read more »

Restoration of Stoke Rochford Hall

Contractor: Austin Newport / Scaffolding Contractor: Harsco (then SGB)

Read more »

Roof Maintenance to Longleat House

Contractor: Ellis and Co / Scaffolding Contractor: TR Services (Bristol) Ltd

Read more »

Remedial Works to Pierhead Building, Cardiff

Scaffolding Contractor: SHS Scaffolding Ltd / Main sub-contractor: Know & Wells

Read more »

Refurbishment of Birmingham Town Hall

Contractor: Stanford Scaffolding, Romford, Essex / Contractor: Wates Construction

Read more »

Replacement Roof on National Trust's Hanbury Hall

Scaffolding Contractor: J.F.E. Attridge Scaffolding Services Co Ltd / Client: National Trust

Read more »

About HAKI

» About HAKI
» HAKI Values
» HAKI Quality
» HAKI History
» Why HAKI?
» Recognize the pirate

Scaffolding

» HAKI Universal
» HAKI Tripod
» Birdcage Scaffold
» Suspended Scaffold

Weather Protection

» Temporary Roofing
» Temporary Shelters
Home  |  Products  |  Projects  |  News  |  Downloads  |  Contact  |  Services  |  About HAKI  |  My pages  |  Sitemap

HAKI in United Kingdom

HAKI LTD

Magnus, Tame Valley Industrial Estate
Tamworth, Staffordshire, B77 5BY
United Kingdom

Tel +44 1 827 28 25 25
Fax +44 1 827 25 03 29

info@haki.co.uk